_________ is the biggest problem you can face if you don’t identify the scope of your risk management project. Scope creep Noncompliance System failure Nonrepudiation

Respuesta :

Numenius
Numenius Numenius
  • 12-09-2019

Answer: Scope creep

Explanation:

 Scope creep in the project management basically refers to the uncontrolled development or growth in the project creep. It basically occur when the project scope are not appropriately defined.

It usually involve lack of change in the control system and increase the complexity of the project. It is also has poor requirement analysis.

So, that is why it is the biggest problem we usually face in the project management.

Answer Link

Otras preguntas

What caused the rise of military government in Japan?
Estimate the angle of elevation from the trailhead to the summit.
The sales tax rate is 8%. Estimate the tax on a jacket that costs $69.95.
How can i solve this f:d->R f(x)=x at power2/x-1
If 4x+5y=10 and x+3y = 8 then (5x+8y)/3=
A midwestern music competition awarded 35 ribbons. The number of blue ribbons awarded was 3 less than the number of white ribbons. the number of red ribbons was
A boy can swim 75 feet in 12 seconds. What is his rate to the nearest mile per hour?
When y = x^2, which of the following expressions is equivalent to –y ?
the rectangles on a quilt are 2in. wide and 3in. long the perimeter of each rectangle is made by pattern of ref thread. if there are 30 rectangles in the quilt,
If 4x+5y=10 and x+3y = 8 then (5x+8y)/3=