kadenceclay26
kadenceclay26 kadenceclay26
  • 03-10-2016
  • Mathematics
contestada

a contractor's crew can frame 3 houses in a week. How long will it take them to frame 54 houses if they frame the same number each week?

Respuesta :

charstar
charstar charstar
  • 03-10-2016
54/3=18

hope this helps :)
Answer Link

Otras preguntas

In chemical reactions, there is a conservation of(1) energy, volume and mass (2) energy, volume and charge (3) energy, charge and mass (4) energy, charge and vo
The theme of Sandburg's poem "Grass" is A. peace. B. war. C. forgetfulness. D. freedom.
Why is Harriet Tubman considered a hero?
The Supreme Court decision in Marbury v. Madison (1803) strengthened the constitutional principle of separation of powers by (1) defining the Court’s role in im
Claire said that all the factors of 72 are multiples of the prime factors of 72. Part A:What are the prime factors of 72? Show your work. Part B:Which factors o
Which elements are malleable and good conductors of electricity?(1) iodine and silver (2) iodine and xenon (3) tin and silver (4) tin and xenon
which event of the French and indain war do you think was the most significant and why
is " No hay que correr en esa calle" grammatically incorrect?
16 million miles in scientific notation
The present-day Republican Party is descended from the _______ Party. A. Federalist B. Democratic Republican C. Anti-Federalist D. Conservative