kanika07bts
kanika07bts kanika07bts
  • 01-03-2021
  • Mathematics
contestada

if 5 workers can build 5 cars in 5 days how many days would it take for 7 workers to build 7 cars

Respuesta :

1uk846 1uk846
  • 01-03-2021

Answer:

7 days

Step-by-step explanation:

It would also take 7 days

Answer Link

Otras preguntas

The brilliant Carthaginian general _______ led war elephants and soldiers through the Alps to attack Rome from the north.
What is tape diagram for a math test plz tell me
What is the missing value? 7^___ / 7^5 = 7^-2 A. 7 B. 3 C. -3 D. -7
_______________ occurs when sensory receptor cells detect a stimulus and then convert it into a neural impulse that transmits that message to the brain. a. Acco
In a foreign country, half of 5 = 3. Based on that same proportion, what's one-third of 10?
F(x)=13x-14 Find the domain of f(x)
Jaiden is writing a report about the structure of the atom. In her report, she says that the atom has three main parts and two subatomic particles. Do you agree
How do you solve 834 divided by 4 using the area model???
In the lock-and-key model of enzyme action, the _______________ fits into _______ of the enzyme. A. product, substrate B. active site, product C. substrate, act
Some properties, such as mass, depend on how much matter is present. Other properties, such as malleability, remain the same no matter how much matter is presen