mparrish2965 mparrish2965
  • 03-07-2022
  • Engineering
contestada

A feature control frame must be connected to

Respuesta :

tcs1257621
tcs1257621 tcs1257621
  • 03-07-2022

Answer:

Surface Parallelism When a surface is to be parallel to a datum plane, the feature control frame is connected by a leader to the surface, or to an extension line from the surface.

Explanation:

Answer Link

Otras preguntas

What is it that Walter has written out on-page, that he wants to show Mama? “A Raisin in The Sun”
Name 6 elements of PQR.
Use the diagram below to find x and each missing angle.
HELP I NEED IT NOW ITS CLASSWORK 20 points
PLEASE HELP!!! Health services is the fastest-growing industry in the United states True or False
Are the two triangles similar? How do you know?
Free brainliest! 1+1 as 7&9~~~100 :)
pls help due in one min Daniel hiked 4 5 8 miles on Saturday and 4 1 2 miles on Sunday. How many miles did he hike in all? A. 8 3 5 miles B. 8 3 4 mi
Selvi deposited RM8 000 in a fixed depositaccount with a simple interest of 3.5% per annumfor a term of a year. Calculate the amount ofSelvi's money at the end
A cross section is the intersection of a _____ an a _____