carlos907030 carlos907030
  • 01-08-2017
  • Mathematics
contestada

if structural steel installed in 2.75 floors of a building 2 3/8 day , how long will it take to install steel in 11 floors

Respuesta :

gentlebiker
gentlebiker gentlebiker
  • 01-08-2017
I will take 9.5 days, to install steel in 11 floors.
Answer Link

Otras preguntas

a ball is tossed vertically upward rises, reaches it's highest point, and then falls back to its starting point. during the time, the acceleration of the ball a
I'm inside the path I'm a difference of two numbers outside the paths what number am I
what are the effects of global warming
A jar contains 133 pennies. a bigger jar contains 1 2/7 times as many pennies. what is the value of the pennies in the bigger jar?
Does the equator cross the northern or southern part of South America? South America is located mostly in which two hemispheres?
How and where has oil, road development, mining, dams and agriculture contributed to local economic, political, and land use issues?
What was the original goal of the Framers when they met at Independence Hall?  How did that goal change?
list the six enternal parts or peripherals of a computer system and identify which are output and which are input devices?
On a TI-84, how do you stop it from giving you simply a number for an answer when you put in a polynomial divided by another polynomial?
Convert 57 mL to its equivalent in L using dimensional analysis