Beverly7520 Beverly7520
  • 01-03-2018
  • Social Studies
contestada

In the lean principles philosophy, unexpected downtime is the result of unreliable processes.

a. True

b. False

Respuesta :

Grace0424
Grace0424 Grace0424
  • 01-03-2018
I thinks the answer is true
Answer Link

Otras preguntas

The automobile industry affected life in the "Roaring 20s" in all of the following ways EXCEPT: A. Suburbs began to spring up, because many people could now d
Tony and his brother have 20 thank you cards to write. If they each write 2 per day, how many days will it take them to finish?
use place value to find the product 40 x 8 = ____ tens x 8 = ____ tens = _____5 x 60 = 5 x ___ tens = ___tens = _____
Explain why hydrogen gas is given off when a reactive metal undergoes a single-displacement reaction with water.
A 2 kilogram object is moving horizontally with a speed of 4m/s. How much net force is required to keep the object moving at this speed and in the direction?
Select the proper inverse operation to check the answer to 25 − 13 = 12. A. 12 × 13 = 25 B. 12 + 13 = 25 C. 12 × 25 = 13 D. 12 ÷ 25 = 13
rebecca has 30 paintings to sell . The amount of money rebecca.makes from selling x paintings is represented by a function. f(x)=25x what is the practical domai
i have been stung by my teacher for repetitive use of the word ' left' ( this left many people in panic) What other words can i use?
When atoms combine, interactions occur between their _____.
What is one reason that precipitation is so heavy in the intertropical convergence zone?