bucksnation4life32 bucksnation4life32
  • 02-12-2020
  • Mathematics
contestada

At the Fast-Pack It shipping, the employees can unload 25 trucks in 5 hours. Which of the following is a correct unit rate for this situation? (4 points)

5 hours per truck
1 truck per hour
1 over 5. of a truck per hour
1 over 5. of an hour per truck

Respuesta :

jadaconnell
jadaconnell jadaconnell
  • 02-12-2020

Answer:

five trucks per hour

Step-by-step explanation:

Answer Link

Otras preguntas

The type and age of rocks found in the mountain range are also found on another continent. What might this mean?
how do i find the angles on a kite?
what is the mRNA sequence from 3 TACGGTAAGCATCTTGGCATAACCCCAATT 5
COMPARISON; 1. How is concrete like chocolate 2. How is a shirt like a picture 3. how is an elephant like a cloud
In terms of weather, what kind of boundary does the line labeled  X represent? A. occluded front B. stationary front C. cold front D. warm front
Which body tissue or organ contains the most mitochondria?
What are some methods used by Mussolini to rise to power?
what rule does static electricity follow
who was the founder of Pennsylvania?
A standard coffee mug has a capacity of 16 fluid ounces. If Annie needs to fill 26 mugs with coffee, how many total quarts of coffee does she need?